Last Update: 1 days ago

Bulkhead
Eagle Mk. II Price Mass
1I Lightweight Alloy 0 Cr 0 t
1I Military Grade Composite 90,050 Cr 8 t
1I Reinforced Alloy 26,880 Cr 4 t
Hauler Price Mass
1I Lightweight Alloy 0 Cr 0 t
1I Military Grade Composite 185,050 Cr 2 t
1I Reinforced Alloy 42,180 Cr 1 t
Sidewinder Mk. I Price Mass
1I Lightweight Alloy 0 Cr 0 t
1I Military Grade Composite 80,320 Cr 4 t
1I Reinforced Alloy 25,600 Cr 2 t
Type-6 Transporter Price Mass
1I Lightweight Alloy 0 Cr 0 t
1I Military Grade Composite 941,350 Cr 23 t
1I Reinforced Alloy 418,380 Cr 12 t
Type-7 Transporter Price Mass
1I Lightweight Alloy 0 Cr 0 t
1I Military Grade Composite 15,725,030 Cr 63 t
1I Reinforced Alloy 6,988,900 Cr 32 t
Krait MkII Price Mass
1I Lightweight Alloy 0 Cr 0 t
1I Military Grade Composite 0 Cr 0 t
1I Reinforced Alloy 0 Cr 0 t
Weapon Hardpoint
Abrasion Blaster Price Mass
1D Abrasion Blaster (Fixed) 0 Cr 0 t
Beam Laser Price Mass Dps Damage
1F Beam Laser (Turret) 500,000 Cr 2 t 3 3
2D Beam Laser (Gimbal) 500,600 Cr 4 t 4 5
2E Beam Laser (Turret) 2,099,900 Cr 4 t 3 4
3C Beam Laser (Fixed) 1,177,600 Cr 8 t 5 6
Burst Laser Price Mass Dps Damage
1G Burst Laser (Gimbal) 8,600 Cr 2 t 3 2
Mine Launcher Price Mass
1I Mine Launcher (Fixed) 24,260 Cr 2 t
Mining Laser Price Mass
1D Mining Laser (Fixed) 6,800 Cr 2 t
Pulse Laser Price Mass Dps Damage
1G Pulse Laser (Turret) 26,000 Cr 2 t 2 2
2F Pulse Laser (Gimbal) 35,400 Cr 4 t 3 3
Rail Gun Price Mass Dps Ammo Damage
1D Rail Gun (Fixed) 51,600 Cr 2 t 4 30 6
Seismic Charge Launcher Price Mass
2B Seismic Charge Launcher (Seeker, Fixed) 0 Cr 0 t
Shock Mine Launcher Price Mass
1I Shock Mine Launcher (Fixed) 36,400 Cr 2 t
Sub-Surface Displacement Missile Price Mass
1B Sub-Surface Displacement Missile (Seeker, Fixed) 0 Cr 0 t
Utility Mount
Chaff Launcher Price Mass
0I Chaff Launcher 8,500 Cr 1.3 t
Essential Equipment
Frame Shift Drive Price Mass
2B Frame Shift Drive 53,410 Cr 4 t
2C Frame Shift Drive 17,800 Cr 2.5 t
2D Frame Shift Drive 5,930 Cr 1 t
3B Frame Shift Drive 169,300 Cr 8 t
3C Frame Shift Drive 56,440 Cr 5 t
3D Frame Shift Drive 18,810 Cr 2 t
Power Plant Price Mass Efficiency Power
2B Power Plant 53,410 Cr 2 t C 8.8
2C Power Plant 17,800 Cr 1.3 t C 8
3B Power Plant 169,300 Cr 4 t C 11
3C Power Plant 56,440 Cr 2.5 t C 10
Internal Compartment
Cargo Rack Price Mass Capacity
1E Cargo Rack 1,000 Cr 0 t 2 t
2E Cargo Rack 3,250 Cr 0 t 4 t
3E Cargo Rack 10,560 Cr 0 t 8 t
4E Cargo Rack 34,330 Cr 0 t 16 t
5E Cargo Rack 111,570 Cr 0 t 32 t
6E Cargo Rack 362,590 Cr 0 t 64 t
7E Cargo Rack 1,178,420 Cr 0 t 128 t
Detailed Surface Scanner Price Mass
1I Detailed Surface Scanner 250,000 Cr 1.3 t
Frame Shift Drive Interdictor Price Mass
1E Frame Shift Drive Interdictor 12,000 Cr 1.3 t
Fuel Scoop Price Mass Rate
1E Fuel Scoop 310 Cr 0 t 18 kg/s
4A Fuel Scoop 2,862,360 Cr 0 t 342 kg/s
4B Fuel Scoop 715,590 Cr 0 t 294 kg/s
5B Fuel Scoop 2,268,420 Cr 0 t 494 kg/s
6A Fuel Scoop 28,763,610 Cr 0 t 878 kg/s
6B Fuel Scoop 7,190,900 Cr 0 t 752 kg/s
6C Fuel Scoop 1,797,730 Cr 0 t 627 kg/s
Hatch Breaker Limpet Controller Price Mass Count Duration Range
1E Hatch Breaker Limpet Controller 600 Cr 1.3 t 2 42 s 1.5 km
Hull Reinforcement Package Price Mass Armor
4D Hull Reinforcement Package 195,000 Cr 8 t 330
5D Hull Reinforcement Package 450,000 Cr 16 t 390
5E Hull Reinforcement Package 150,000 Cr 32 t 360
Module Reinforcement Package Price Mass
3D Module Reinforcement Package 84,000 Cr 4 t
4D Module Reinforcement Package 195,000 Cr 8 t
5D Module Reinforcement Package 450,000 Cr 16 t
5E Module Reinforcement Package 150,000 Cr 32 t
Planetary Vehicle Hangar Price Mass Vehicle Count
2G Planetary Vehicle Hangar 21,600 Cr 6 t 1
2H Planetary Vehicle Hangar 18,000 Cr 12 t 1
4G Planetary Vehicle Hangar 86,400 Cr 10 t 2
4H Planetary Vehicle Hangar 72,000 Cr 20 t 2
6G Planetary Vehicle Hangar 691,200 Cr 17 t 4
6H Planetary Vehicle Hangar 576,000 Cr 34 t 4
Prospector Limpet Controller Price Mass Count Range
1C Prospector Limpet Controller 2,400 Cr 1.3 t 1 5 km
3C Prospector Limpet Controller 21,600 Cr 5 t 2 5.5 km
5C Prospector Limpet Controller 194,400 Cr 20 t 4 6.5 km
5D Prospector Limpet Controller 97,200 Cr 8 t 4 5.2 km
7C Prospector Limpet Controller 1,749,600 Cr 80 t 8 8.5 km
7D Prospector Limpet Controller 874,800 Cr 32 t 8 6.8 km
7E Prospector Limpet Controller 437,400 Cr 80 t 8 5.1 km
Refinery Price Mass Bins
1A Refinery 486,000 Cr 0 t 4
1B Refinery 162,000 Cr 0 t 3
1C Refinery 54,000 Cr 0 t 2
1D Refinery 18,000 Cr 0 t 1
1E Refinery 6,000 Cr 0 t 1
2B Refinery 340,200 Cr 0 t 5
2C Refinery 113,400 Cr 0 t 4
2D Refinery 37,800 Cr 0 t 3
2E Refinery 12,600 Cr 0 t 2
Shield Cell Bank Price Mass Cells Recharge
5C Shield Cell Bank 194,143 Cr 20 t 4 C
6C Shield Cell Bank 556,110 Cr 40 t 5 C
Shield Generator Price Mass
2E Shield Generator 1,980 Cr 2.5 t
Standard Docking Computer Price Mass
1E Standard Docking Computer 4,500 Cr 0 t
Supercruise Assist Price Mass
1E Supercruise Assist 0 Cr 0 t
Advertisement