Last Update: 12 days ago

Weapon Hardpoint
Abrasion Blaster Price Mass
1D Abrasion Blaster (Fixed) 0 Cr 0 t
Beam Laser Price Mass Dps Damage
2D Beam Laser (Gimbal) 500,600 Cr 4 t 4 5
3C Beam Laser (Fixed) 1,177,600 Cr 8 t 5 6
3C Beam Laser (Gimbal) 2,396,160 Cr 8 t 4 6
3D Beam Laser (Turret) 19,399,600 Cr 8 t 4 5
4A Beam Laser (Fixed) 2,396,160 Cr 16 t
Cannon Price Mass Dps Damage
1D Cannon (Fixed) 21,100 Cr 2 t 3 5
1E Cannon (Gimbal) 42,200 Cr 2 t 3 5
1F Cannon (Turret) 506,400 Cr 2 t 3 4
2D Cannon (Fixed) 168,430 Cr 4 t 4 6
2D Cannon (Gimbal) 337,600 Cr 4 t 3 6
3C Cannon (Fixed) 675,200 Cr 8 t 4 7
3C Cannon (Gimbal) 1,350,400 Cr 8 t 4 7
Fragment Cannon Price Mass Dps Damage
1E Fragment Cannon (Gimbal) 54,720 Cr 2 t 7 2
1E Fragment Cannon (Turret) 182,400 Cr 2 t 6 1
3C Fragment Cannon (Fixed) 1,167,360 Cr 8 t 10 3
Mine Launcher Price Mass
1I Mine Launcher (Fixed) 24,260 Cr 2 t
Mining Laser Price Mass
1D Mining Laser (Fixed) 6,800 Cr 2 t
1D Mining Laser 9,400 Cr 2 t
Missile Rack Price Mass Dps Ammo Damage
1B Missile Rack (Seeker, Fixed) 72,600 Cr 2 t 3 6 6
1B Missile Rack (Dumbfire, Fixed) 32,180 Cr 2 t 8 16 7
2B Missile Rack (Seeker, Fixed) 512,400 Cr 4 t 3 18 6
2B Missile Rack (Dumbfire, Fixed) 240,400 Cr 4 t 8 24 7
3A Missile Rack (Dumbfire, Fixed) 0 Cr 0 t
Multi-Cannon Price Mass Dps Ammo Damage
1G Multi-Cannon (Gimbal) 14,250 Cr 2 t 3 2,100 2
1G Multi-Cannon (Turret) 81,600 Cr 2 t 2 2,100
2E Multi-Cannon (Fixed) 38,000 Cr 4 t 4 2,100 2
2F Multi-Cannon (Gimbal) 57,000 Cr 4 t 4 2,100 2
2F Multi-Cannon (Turret) 1,292,800 Cr 4 t 3 2,100 2
3C Multi-Cannon (Gimbal) 578,436 Cr 8 t
Plasma Accelerator Price Mass Dps Ammo Damage
3B Plasma Accelerator (Fixed) 3,051,200 Cr 8 t 4 100 9
Rail Gun Price Mass Dps Ammo Damage
1D Rail Gun (Fixed) 51,600 Cr 2 t 4 30 6
2B Rail Gun (Fixed) 412,800 Cr 4 t 4 30 7
Seismic Charge Launcher Price Mass
2B Seismic Charge Launcher (Seeker, Fixed) 0 Cr 0 t
Shock Mine Launcher Price Mass
1I Shock Mine Launcher (Fixed) 36,400 Cr 2 t
Sub-Surface Displacement Missile Price Mass
1B Sub-Surface Displacement Missile (Seeker, Fixed) 0 Cr 0 t
2B Sub-Surface Displacement Missile (Seeker, Fixed) 0 Cr 0 t
Torpedo Pylon Price Mass
1I Torpedo Pylon (Seeker, Fixed) 11,200 Cr 2 t
Utility Mount
Chaff Launcher Price Mass
0I Chaff Launcher 8,500 Cr 1.3 t
Electronic Countermeasure Price Mass Range
0F Electronic Countermeasure 12,500 Cr 1.3 t 3 km
Heat Sink Launcher Price Mass
0I Heat Sink Launcher 3,500 Cr 1.3 t
Shield Booster Price Mass
0B Shield Booster 122,000 Cr 3 t
0D Shield Booster 23,000 Cr 1 t
0E Shield Booster 10,000 Cr 0.5 t
Essential Equipment
Frame Shift Drive Price Mass
2B Frame Shift Drive 53,410 Cr 4 t
2C Frame Shift Drive 17,800 Cr 2.5 t
2D Frame Shift Drive 5,930 Cr 1 t
2E Frame Shift Drive 1,980 Cr 2.5 t
3B Frame Shift Drive 169,300 Cr 8 t
3C Frame Shift Drive 56,440 Cr 5 t
3D Frame Shift Drive 18,810 Cr 2 t
3E Frame Shift Drive 6,270 Cr 5 t
4B Frame Shift Drive 536,690 Cr 16 t
6C Frame Shift Drive 1,797,730 Cr 40 t
7C Frame Shift Drive 5,698,790 Cr 80 t
Fuel Tank Price Mass Capacity
4C Fuel Tank 24,730 Cr 0 t 16 t
5C Fuel Tank 97,750 Cr 0 t 32 t
6C Fuel Tank 341,580 Cr 0 t 64 t
7C Fuel Tank 1,780,910 Cr 0 t 128 t
8C Fuel Tank 5,428,400 Cr 0 t 256 t
Life Support Price Mass Duration
1B Life Support 8,080 Cr 2 t 900 s
1C Life Support 3,230 Cr 1.3 t 600 s
2C Life Support 9,050 Cr 2.5 t 600 s
3B Life Support 63,330 Cr 8 t 900 s
3C Life Support 25,330 Cr 5 t 600 s
7D Life Support 622,840 Cr 32 t 450 s
8D Life Support 1,743,970 Cr 64 t 450 s
8E Life Support 697,590 Cr 160 t 300 s
Power Distributor Price Mass
1B Power Distributor 8,080 Cr 2 t
1C Power Distributor 3,230 Cr 1.3 t
1D Power Distributor 1,290 Cr 0.5 t
1E Power Distributor 520 Cr 1.3 t
2B Power Distributor 22,620 Cr 4 t
2C Power Distributor 9,050 Cr 2.5 t
2D Power Distributor 3,620 Cr 1 t
2E Power Distributor 1,450 Cr 2.5 t
3B Power Distributor 63,330 Cr 8 t
3C Power Distributor 25,330 Cr 5 t
3D Power Distributor 10,130 Cr 2 t
3E Power Distributor 4,050 Cr 5 t
4B Power Distributor 177,330 Cr 16 t
4C Power Distributor 70,930 Cr 10 t
4D Power Distributor 28,370 Cr 4 t
4E Power Distributor 11,350 Cr 10 t
5C Power Distributor 198,610 Cr 20 t
5D Power Distributor 79,440 Cr 8 t
5E Power Distributor 31,780 Cr 20 t
6C Power Distributor 556,110 Cr 40 t
6D Power Distributor 222,440 Cr 16 t
6E Power Distributor 88,980 Cr 40 t
Power Plant Price Mass Efficiency Power
2B Power Plant 53,410 Cr 2 t C 8.8
2C Power Plant 17,800 Cr 1.3 t C 8
2D Power Plant 5,930 Cr 1 t D 7.2
2E Power Plant 1,980 Cr 2.5 t F 6.4
3B Power Plant 169,300 Cr 4 t C 11
3C Power Plant 56,440 Cr 2.5 t C 10
3D Power Plant 18,810 Cr 2 t D 9
3E Power Plant 6,270 Cr 5 t F 8
4B Power Plant 536,690 Cr 8 t C 14.3
5C Power Plant 567,110 Cr 10 t C 17
6C Power Plant 1,797,730 Cr 20 t C 21
6D Power Plant 599,240 Cr 16 t D 18.9
7C Power Plant 5,698,790 Cr 40 t C 25
7D Power Plant 1,899,600 Cr 32 t D 22.5
8D Power Plant 6,021,720 Cr 64 t D 27
8E Power Plant 2,007,240 Cr 160 t F 24
Thrusters Price Mass
2B Thrusters 53,410 Cr 4 t
2C Thrusters 17,800 Cr 2.5 t
2D Thrusters 5,930 Cr 1 t
2E Thrusters 1,980 Cr 2.5 t
3B Thrusters 169,300 Cr 8 t
3C Thrusters 56,440 Cr 5 t
3D Thrusters 18,810 Cr 2 t
3E Thrusters 6,270 Cr 5 t
7C Thrusters 5,698,790 Cr 80 t
7D Thrusters 1,899,600 Cr 32 t
8D Thrusters 6,021,720 Cr 64 t
8E Thrusters 2,007,240 Cr 160 t
Internal Compartment
Advanced Docking Computer Price Mass
1E Advanced Docking Computer 0 Cr 0 t
Auto Field-Maintenance Unit Price Mass
3C Auto Field-Maintenance Unit 291,600 Cr 0 t
5D Auto Field-Maintenance Unit 314,930 Cr 0 t
6D Auto Field-Maintenance Unit 566,870 Cr 0 t
8E Auto Field-Maintenance Unit 612,220 Cr 0 t
Bi-Weave Shield Generator Price Mass
2C Bi-Weave Shield Generator 26,710 Cr 2.5 t
3C Bi-Weave Shield Generator 84,650 Cr 5 t
Cargo Rack Price Mass Capacity
1E Cargo Rack 1,000 Cr 0 t 2 t
2E Cargo Rack 3,250 Cr 0 t 4 t
3E Cargo Rack 10,560 Cr 0 t 8 t
4E Cargo Rack 34,330 Cr 0 t 16 t
5E Cargo Rack 111,570 Cr 0 t 32 t
6E Cargo Rack 362,590 Cr 0 t 64 t
7E Cargo Rack 1,178,420 Cr 0 t 128 t
8E Cargo Rack 3,829,870 Cr 0 t 256 t
Collector Limpet Controller Price Mass Count Duration Range
1B Collector Limpet Controller 4,800 Cr 2 t 1 420 s 1.4 km
3C Collector Limpet Controller 21,600 Cr 5 t 2 510 s 1.1 km
5D Collector Limpet Controller 97,200 Cr 8 t 3 600 s 0.78 km
7E Collector Limpet Controller 437,400 Cr 32 t 4 300 s 1.36 km
Detailed Surface Scanner Price Mass
1I Detailed Surface Scanner 250,000 Cr 1.3 t
Frame Shift Drive Interdictor Price Mass
1E Frame Shift Drive Interdictor 12,000 Cr 1.3 t
3A Frame Shift Drive Interdictor 7,620,480 Cr 5 t
3B Frame Shift Drive Interdictor 2,540,160 Cr 8 t
3C Frame Shift Drive Interdictor 846,720 Cr 5 t
4A Frame Shift Drive Interdictor 21,337,340 Cr 10 t
4B Frame Shift Drive Interdictor 7,112,450 Cr 16 t
4C Frame Shift Drive Interdictor 2,370,820 Cr 10 t
4D Frame Shift Drive Interdictor 790,270 Cr 4 t
4E Frame Shift Drive Interdictor 263,420 Cr 10 t
Fuel Scoop Price Mass Rate
1E Fuel Scoop 310 Cr 0 t 18 kg/s
Hatch Breaker Limpet Controller Price Mass Count Duration Range
1B Hatch Breaker Limpet Controller 4,800 Cr 2 t 2 24 s 3 km
1C Hatch Breaker Limpet Controller 2,400 Cr 1.3 t 1 30 s 2.5 km
1D Hatch Breaker Limpet Controller 1,200 Cr 0.5 t 1 36 s 2 km
1E Hatch Breaker Limpet Controller 600 Cr 1.3 t 2 42 s 1.5 km
3B Hatch Breaker Limpet Controller 43,200 Cr 8 t 4 21 s 3.24 km
3C Hatch Breaker Limpet Controller 21,600 Cr 5 t 3 26 s 2.7 km
3D Hatch Breaker Limpet Controller 10,800 Cr 2 t 3 31 s 2.16 km
3E Hatch Breaker Limpet Controller 5,400 Cr 5 t 4 36 s 1.62 km
5C Hatch Breaker Limpet Controller 194,400 Cr 20 t 7 22 s 3.3 km
5D Hatch Breaker Limpet Controller 97,200 Cr 8 t 6 26 s 2.64 km
5E Hatch Breaker Limpet Controller 48,600 Cr 20 t 9 31 s 1.98 km
7C Hatch Breaker Limpet Controller 1,749,600 Cr 80 t 15 18 s 4.3 km
7D Hatch Breaker Limpet Controller 874,800 Cr 32 t 12 22 s 3.44 km
7E Hatch Breaker Limpet Controller 437,400 Cr 80 t 18 25 s 2.58 km
Hull Reinforcement Package Price Mass Armor
1D Hull Reinforcement Package 15,000 Cr 1 t 110
2D Hull Reinforcement Package 36,000 Cr 2 t 190
3D Hull Reinforcement Package 84,000 Cr 4 t 260
Module Reinforcement Package Price Mass
1D Module Reinforcement Package 15,000 Cr 1 t
2D Module Reinforcement Package 36,000 Cr 2 t
3D Module Reinforcement Package 84,000 Cr 4 t
4D Module Reinforcement Package 195,000 Cr 8 t
5D Module Reinforcement Package 450,000 Cr 16 t
Planetary Vehicle Hangar Price Mass Vehicle Count
2G Planetary Vehicle Hangar 21,600 Cr 6 t 1
2H Planetary Vehicle Hangar 18,000 Cr 12 t 1
4G Planetary Vehicle Hangar 86,400 Cr 10 t 2
4H Planetary Vehicle Hangar 72,000 Cr 20 t 2
6G Planetary Vehicle Hangar 691,200 Cr 17 t 4
6H Planetary Vehicle Hangar 576,000 Cr 34 t 4
Prospector Limpet Controller Price Mass Count Range
1B Prospector Limpet Controller 4,800 Cr 2 t 1 6 km
1C Prospector Limpet Controller 2,400 Cr 1.3 t 1 5 km
1D Prospector Limpet Controller 1,200 Cr 0.5 t 1 4 km
1E Prospector Limpet Controller 600 Cr 1.3 t 1 3 km
3B Prospector Limpet Controller 43,200 Cr 8 t 2 6.6 km
3C Prospector Limpet Controller 21,600 Cr 5 t 2 5.5 km
3D Prospector Limpet Controller 10,800 Cr 2 t 2 4.4 km
3E Prospector Limpet Controller 5,400 Cr 5 t 2 3.3 km
5C Prospector Limpet Controller 194,400 Cr 20 t 4 6.5 km
5D Prospector Limpet Controller 97,200 Cr 8 t 4 5.2 km
5E Prospector Limpet Controller 48,600 Cr 20 t 4 3.9 km
7C Prospector Limpet Controller 1,749,600 Cr 80 t 8 8.5 km
7D Prospector Limpet Controller 874,800 Cr 32 t 8 6.8 km
7E Prospector Limpet Controller 437,400 Cr 80 t 8 5.1 km
Recon Limpet Controller Price Mass
5E Recon Limpet Controller 0 Cr 0 t
7E Recon Limpet Controller 0 Cr 0 t
Refinery Price Mass Bins
1A Refinery 486,000 Cr 0 t 4
1B Refinery 162,000 Cr 0 t 3
1C Refinery 54,000 Cr 0 t 2
1D Refinery 18,000 Cr 0 t 1
1E Refinery 6,000 Cr 0 t 1
2B Refinery 340,200 Cr 0 t 5
2C Refinery 113,400 Cr 0 t 4
2D Refinery 37,800 Cr 0 t 3
2E Refinery 12,600 Cr 0 t 2
Repair Limpet Controller Price Mass
3B Repair Limpet Controller 0 Cr 0 t
7C Repair Limpet Controller 0 Cr 0 t
Rescue Multi Limpet Controller Price Mass
3C Rescue Multi Limpet Controller 0 Cr 0 t
Shield Cell Bank Price Mass Cells Recharge
1C Shield Cell Bank 3,231 Cr 1.3 t 3 D
1D Shield Cell Bank 1,293 Cr 0.5 t 2 E
2B Shield Cell Bank 22,619 Cr 4 t 5 D
2C Shield Cell Bank 9,048 Cr 2.5 t 4 D
2D Shield Cell Bank 3,619 Cr 1 t 3 D
3B Shield Cell Bank 61,909 Cr 8 t 5 C
3C Shield Cell Bank 25,333 Cr 5 t 4 D
3D Shield Cell Bank 10,133 Cr 2 t 3 D
3E Shield Cell Bank 4,053 Cr 5 t 5 D
4B Shield Cell Bank 177,331 Cr 16 t 5 C
4C Shield Cell Bank 70,932 Cr 10 t 4 C
5C Shield Cell Bank 194,143 Cr 20 t 4 C
5D Shield Cell Bank 79,444 Cr 8 t 3 C
6C Shield Cell Bank 556,110 Cr 40 t 5 C
6D Shield Cell Bank 222,444 Cr 16 t 4 C
7C Shield Cell Bank 1,557,108 Cr 80 t 5 B
7D Shield Cell Bank 622,843 Cr 32 t 4 C
7E Shield Cell Bank 249,137 Cr 80 t 6 D
8C Shield Cell Bank 4,359,903 Cr 160 t 5 B
8D Shield Cell Bank 1,743,961 Cr 64 t 4 C
8E Shield Cell Bank 697,584 Cr 160 t 6 C
Shield Generator Price Mass
2E Shield Generator 1,980 Cr 2.5 t
3B Shield Generator 169,300 Cr 8 t
Standard Docking Computer Price Mass
1E Standard Docking Computer 4,500 Cr 0 t
Supercruise Assist Price Mass
1E Supercruise Assist 0 Cr 0 t
Advertisement