Last Update: 49 days ago

Weapon Hardpoint
Burst Laser Price Mass Dps Damage
3E Burst Laser (Turret) 800,400 Cr 8 t 4 3
4E Burst Laser (Gimbal) 1,245,600 Cr 16 t
Fragment Cannon Price Mass Dps Damage
1E Fragment Cannon (Gimbal) 54,720 Cr 2 t 7 2
1E Fragment Cannon (Turret) 182,400 Cr 2 t 6 1
2D Fragment Cannon (Turret) 1,459,200 Cr 4 t 9 2
3C Fragment Cannon (Fixed) 1,167,360 Cr 8 t 10 3
Mine Launcher Price Mass
1I Mine Launcher (Fixed) 24,260 Cr 2 t
Missile Rack Price Mass Dps Ammo Damage
1B Missile Rack (Dumbfire, Fixed) 32,180 Cr 2 t 8 16 7
2B Missile Rack (Dumbfire, Fixed) 240,400 Cr 4 t 8 24 7
3A Missile Rack (Seeker, Fixed) 0 Cr 0 t
Multi-Cannon Price Mass Dps Ammo Damage
1G Multi-Cannon (Gimbal) 14,250 Cr 2 t 3 2,100 2
1G Multi-Cannon (Turret) 81,600 Cr 2 t 2 2,100
4A Multi-Cannon (Fixed) 1,177,600 Cr 16 t
Pulse Laser Price Mass Dps Damage
1G Pulse Laser (Turret) 26,000 Cr 2 t 2 2
4A Pulse Laser (Gimbal) 877,600 Cr 16 t
Shock Mine Launcher Price Mass
1I Shock Mine Launcher (Fixed) 36,400 Cr 2 t
Torpedo Pylon Price Mass
1I Torpedo Pylon (Seeker, Fixed) 11,200 Cr 2 t
2I Torpedo Pylon (Seeker, Fixed) 44,800 Cr 4 t
Utility Mount
Cargo Scanner Price Mass Duration Range
0A Cargo Scanner 1,097,100 Cr 1.3 t 10 s 4 km
0E Cargo Scanner 13,540 Cr 1.3 t 10 s 2 km
Chaff Launcher Price Mass
0I Chaff Launcher 8,500 Cr 1.3 t
Frame Shift Wake Scanner Price Mass Duration Range
0A Frame Shift Wake Scanner 1,097,100 Cr 1.3 t 10 s 4 km
0E Frame Shift Wake Scanner 13,540 Cr 1.3 t 10 s 2 km
Heat Sink Launcher Price Mass
0I Heat Sink Launcher 3,500 Cr 1.3 t
Kill Warrant Scanner Price Mass Duration Range
0B Kill Warrant Scanner 365,700 Cr 1.3 t 10 s 3.5 km
0C Kill Warrant Scanner 121,900 Cr 1.3 t 10 s 3 km
Point Defence Price Mass
0I Point Defence 18,550 Cr 0.5 t
Essential Equipment
Frame Shift Drive Price Mass
2A Frame Shift Drive 160,220 Cr 2.5 t
2B Frame Shift Drive 53,410 Cr 4 t
2C Frame Shift Drive 17,800 Cr 2.5 t
2D Frame Shift Drive 5,930 Cr 1 t
2E Frame Shift Drive 1,980 Cr 2.5 t
3A Frame Shift Drive 507,910 Cr 5 t
3C Frame Shift Drive 56,440 Cr 5 t
3D Frame Shift Drive 18,810 Cr 2 t
3E Frame Shift Drive 6,270 Cr 5 t
Fuel Tank Price Mass Capacity
2C Fuel Tank 3,750 Cr 0 t 4 t
3C Fuel Tank 7,060 Cr 0 t 8 t
4C Fuel Tank 24,730 Cr 0 t 16 t
5C Fuel Tank 97,750 Cr 0 t 32 t
6C Fuel Tank 341,580 Cr 0 t 64 t
7C Fuel Tank 1,780,910 Cr 0 t 128 t
8C Fuel Tank 5,428,400 Cr 0 t 256 t
Power Distributor Price Mass
1A Power Distributor 20,200 Cr 1.3 t
1B Power Distributor 8,080 Cr 2 t
2B Power Distributor 22,620 Cr 4 t
3A Power Distributor 158,330 Cr 5 t
3B Power Distributor 63,330 Cr 8 t
7A Power Distributor 9,731,930 Cr 80 t
7B Power Distributor 3,892,770 Cr 128 t
7C Power Distributor 1,557,110 Cr 80 t
7D Power Distributor 622,840 Cr 32 t
8A Power Distributor 27,249,390 Cr 160 t
8C Power Distributor 4,359,900 Cr 160 t
Power Plant Price Mass Efficiency Power
2A Power Plant 160,220 Cr 1.3 t B 9.6
2B Power Plant 53,410 Cr 2 t C 8.8
2C Power Plant 17,800 Cr 1.3 t C 8
2D Power Plant 5,930 Cr 1 t D 7.2
2E Power Plant 1,980 Cr 2.5 t F 6.4
3A Power Plant 507,910 Cr 2.5 t B 12
3C Power Plant 56,440 Cr 2.5 t C 10
3D Power Plant 18,810 Cr 2 t D 9
3E Power Plant 6,270 Cr 5 t F 8
Internal Compartment
Advanced Docking Computer Price Mass
1E Advanced Docking Computer 0 Cr 0 t
Auto Field-Maintenance Unit Price Mass
6A Auto Field-Maintenance Unit 15,305,500 Cr 0 t
6D Auto Field-Maintenance Unit 566,870 Cr 0 t
8A Auto Field-Maintenance Unit 49,589,820 Cr 0 t
8B Auto Field-Maintenance Unit 16,529,940 Cr 0 t
8E Auto Field-Maintenance Unit 612,220 Cr 0 t
Bi-Weave Shield Generator Price Mass
1C Bi-Weave Shield Generator 7,710 Cr 1.3 t
2C Bi-Weave Shield Generator 26,710 Cr 2.5 t
3C Bi-Weave Shield Generator 84,650 Cr 5 t
5C Bi-Weave Shield Generator 850,660 Cr 20 t
6C Bi-Weave Shield Generator 2,696,600 Cr 40 t
Cargo Rack Price Mass Capacity
1E Cargo Rack 1,000 Cr 0 t 2 t
Detailed Surface Scanner Price Mass
1I Detailed Surface Scanner 250,000 Cr 1.3 t
Frame Shift Drive Interdictor Price Mass
1C Frame Shift Drive Interdictor 108,000 Cr 1.3 t
1D Frame Shift Drive Interdictor 36,000 Cr 0.5 t
1E Frame Shift Drive Interdictor 12,000 Cr 1.3 t
2C Frame Shift Drive Interdictor 302,400 Cr 2.5 t
2D Frame Shift Drive Interdictor 100,800 Cr 1 t
2E Frame Shift Drive Interdictor 33,600 Cr 2.5 t
Fuel Scoop Price Mass Rate
1A Fuel Scoop 82,270 Cr 0 t 42 kg/s
1E Fuel Scoop 310 Cr 0 t 18 kg/s
2B Fuel Scoop 71,210 Cr 0 t 65 kg/s
2C Fuel Scoop 17,800 Cr 0 t 54 kg/s
3C Fuel Scoop 56,440 Cr 0 t 126 kg/s
Hatch Breaker Limpet Controller Price Mass Count Duration Range
1E Hatch Breaker Limpet Controller 600 Cr 1.3 t 2 42 s 1.5 km
Planetary Vehicle Hangar Price Mass Vehicle Count
2G Planetary Vehicle Hangar 21,600 Cr 6 t 1
2H Planetary Vehicle Hangar 18,000 Cr 12 t 1
4G Planetary Vehicle Hangar 86,400 Cr 10 t 2
4H Planetary Vehicle Hangar 72,000 Cr 20 t 2
6G Planetary Vehicle Hangar 691,200 Cr 17 t 4
6H Planetary Vehicle Hangar 576,000 Cr 34 t 4
Prospector Limpet Controller Price Mass Count Range
1A Prospector Limpet Controller 9,600 Cr 1.3 t 1 7 km
1C Prospector Limpet Controller 2,400 Cr 1.3 t 1 5 km
1D Prospector Limpet Controller 1,200 Cr 0.5 t 1 4 km
1E Prospector Limpet Controller 600 Cr 1.3 t 1 3 km
3A Prospector Limpet Controller 86,400 Cr 5 t 2 7.7 km
3C Prospector Limpet Controller 21,600 Cr 5 t 2 5.5 km
3D Prospector Limpet Controller 10,800 Cr 2 t 2 4.4 km
3E Prospector Limpet Controller 5,400 Cr 5 t 2 3.3 km
5A Prospector Limpet Controller 777,600 Cr 20 t 4 9.1 km
5B Prospector Limpet Controller 388,800 Cr 32 t 4 7.8 km
5D Prospector Limpet Controller 97,200 Cr 8 t 4 5.2 km
5E Prospector Limpet Controller 48,600 Cr 20 t 4 3.9 km
7B Prospector Limpet Controller 3,499,200 Cr 128 t 8 10.2 km
7C Prospector Limpet Controller 1,749,600 Cr 80 t 8 8.5 km
7E Prospector Limpet Controller 437,400 Cr 80 t 8 5.1 km
Refinery Price Mass Bins
1A Refinery 486,000 Cr 0 t 4
1B Refinery 162,000 Cr 0 t 3
1C Refinery 54,000 Cr 0 t 2
1E Refinery 6,000 Cr 0 t 1
2A Refinery 1,020,600 Cr 0 t 6
2B Refinery 340,200 Cr 0 t 5
2C Refinery 113,400 Cr 0 t 4
2D Refinery 37,800 Cr 0 t 3
2E Refinery 12,600 Cr 0 t 2
3A Refinery 2,143,260 Cr 0 t 8
4A Refinery 4,500,850 Cr 0 t 10
4B Refinery 1,500,280 Cr 0 t 9
4C Refinery 500,090 Cr 0 t 7
Shield Cell Bank Price Mass Cells Recharge
3A Shield Cell Bank 158,331 Cr 5 t 4 C
Shield Generator Price Mass
2A Shield Generator 160,220 Cr 2.5 t
2B Shield Generator 53,410 Cr 4 t
2E Shield Generator 1,980 Cr 2.5 t
3A Shield Generator 507,910 Cr 5 t
3B Shield Generator 169,300 Cr 8 t
4A Shield Generator 1,610,080 Cr 10 t
4B Shield Generator 536,690 Cr 16 t
5B Shield Generator 1,701,320 Cr 32 t
6A Shield Generator 16,179,530 Cr 40 t
6B Shield Generator 5,393,180 Cr 64 t
6C Shield Generator 1,797,730 Cr 40 t
Supercruise Assist Price Mass
1E Supercruise Assist 0 Cr 0 t
Advertisement