Last Update: 150 days ago

Bulkhead
Eagle Mk. II Price Mass
1I Lightweight Alloy 0 Cr 0 t
1I Military Grade Composite 90,050 Cr 8 t
1I Mirrored Surface Composite 140,090 Cr 8 t
1I Reactive Surface Composite 150,390 Cr 8 t
1I Reinforced Alloy 26,880 Cr 4 t
Federal Dropship Price Mass
1I Lightweight Alloy 0 Cr 0 t
1I Military Grade Composite 12,882,780 Cr 87 t
1I Mirrored Surface Composite 30,446,310 Cr 87 t
1I Reactive Surface Composite 33,738,580 Cr 87 t
1I Reinforced Alloy 5,725,680 Cr 44 t
Vulture Price Mass
1I Lightweight Alloy 0 Cr 0 t
1I Military Grade Composite 4,433,050 Cr 35 t
1I Mirrored Surface Composite 10,476,780 Cr 35 t
1I Reactive Surface Composite 11,609,670 Cr 35 t
1I Reinforced Alloy 1,970,250 Cr 17 t
Weapon Hardpoint
Abrasion Blaster Price Mass
1D Abrasion Blaster (Fixed) 0 Cr 0 t
Beam Laser Price Mass Dps Damage
3C Beam Laser (Fixed) 1,177,600 Cr 8 t 5 6
4A Beam Laser (Fixed) 2,396,160 Cr 16 t
Cannon Price Mass Dps Damage
1E Cannon (Gimbal) 42,200 Cr 2 t 3 5
1F Cannon (Turret) 506,400 Cr 2 t 3 4
2D Cannon (Fixed) 168,430 Cr 4 t 4 6
2E Cannon (Turret) 4,051,200 Cr 4 t 3 5
4B Cannon (Fixed) 2,700,800 Cr 16 t 5 9
Fragment Cannon Price Mass Dps Damage
1E Fragment Cannon (Gimbal) 54,720 Cr 2 t 7 2
1E Fragment Cannon (Turret) 182,400 Cr 2 t 6 1
3C Fragment Cannon (Fixed) 1,167,360 Cr 8 t 10 3
Mine Launcher Price Mass
1I Mine Launcher (Fixed) 24,260 Cr 2 t
Mining Laser Price Mass
1D Mining Laser 9,400 Cr 2 t
Missile Rack Price Mass Dps Ammo Damage
1B Missile Rack (Seeker, Fixed) 72,600 Cr 2 t 3 6 6
2B Missile Rack (Seeker, Fixed) 512,400 Cr 4 t 3 18 6
2B Missile Rack (Dumbfire, Fixed) 240,400 Cr 4 t 8 24 7
Multi-Cannon Price Mass Dps Ammo
1G Multi-Cannon (Turret) 81,600 Cr 2 t 2 2,100
2E Multi-Cannon (Fixed) 38,000 Cr 4 t 4 2,100 2
2F Multi-Cannon (Gimbal) 57,000 Cr 4 t 4 2,100 2
3C Multi-Cannon (Fixed) 140,400 Cr 8 t
Plasma Accelerator Price Mass Dps Ammo Damage
3B Plasma Accelerator (Fixed) 3,051,200 Cr 8 t 4 100 9
Rail Gun Price Mass Dps Ammo Damage
1D Rail Gun (Fixed) 51,600 Cr 2 t 4 30 6
2B Rail Gun (Fixed) 412,800 Cr 4 t 4 30 7
Seismic Charge Launcher Price Mass
2B Seismic Charge Launcher (Seeker, Fixed) 0 Cr 0 t
Shock Mine Launcher Price Mass
1I Shock Mine Launcher (Fixed) 36,400 Cr 2 t
Sub-Surface Displacement Missile Price Mass
1B Sub-Surface Displacement Missile (Seeker, Fixed) 0 Cr 0 t
2B Sub-Surface Displacement Missile (Seeker, Fixed) 0 Cr 0 t
Torpedo Pylon Price Mass
1I Torpedo Pylon (Seeker, Fixed) 11,200 Cr 2 t
2I Torpedo Pylon (Seeker, Fixed) 44,800 Cr 4 t
3I Torpedo Pylon (Seeker, Fixed) 0 Cr 0 t
Utility Mount
Chaff Launcher Price Mass
0I Chaff Launcher 8,500 Cr 1.3 t
Electronic Countermeasure Price Mass Range
0F Electronic Countermeasure 12,500 Cr 1.3 t 3 km
Heat Sink Launcher Price Mass
0I Heat Sink Launcher 3,500 Cr 1.3 t
Essential Equipment
Advanced Planetary Approach Suite Price Mass
1I Advanced Planetary Approach Suite 0 Cr 0 t
Frame Shift Drive Price Mass
2A Frame Shift Drive 160,220 Cr 2.5 t
2B Frame Shift Drive 53,410 Cr 4 t
2C Frame Shift Drive 17,800 Cr 2.5 t
2D Frame Shift Drive 5,930 Cr 1 t
2E Frame Shift Drive 1,980 Cr 2.5 t
3B Frame Shift Drive 169,300 Cr 8 t
3C Frame Shift Drive 56,440 Cr 5 t
3D Frame Shift Drive 18,810 Cr 2 t
3E Frame Shift Drive 6,270 Cr 5 t
Life Support Price Mass Duration
1A Life Support 20,200 Cr 1.3 t 1,500 s
1B Life Support 8,080 Cr 2 t 900 s
1C Life Support 3,230 Cr 1.3 t 600 s
2A Life Support 56,550 Cr 2.5 t 1,500 s
2B Life Support 22,620 Cr 4 t 900 s
3C Life Support 25,330 Cr 5 t 600 s
7B Life Support 3,892,770 Cr 128 t 900 s
7C Life Support 1,557,110 Cr 80 t 600 s
8C Life Support 4,359,900 Cr 160 t 600 s
Power Distributor Price Mass
1B Power Distributor 8,080 Cr 2 t
1C Power Distributor 3,230 Cr 1.3 t
1D Power Distributor 1,290 Cr 0.5 t
1E Power Distributor 520 Cr 1.3 t
2B Power Distributor 22,620 Cr 4 t
2C Power Distributor 9,050 Cr 2.5 t
2D Power Distributor 3,620 Cr 1 t
2E Power Distributor 1,450 Cr 2.5 t
3C Power Distributor 25,330 Cr 5 t
3D Power Distributor 10,130 Cr 2 t
3E Power Distributor 4,050 Cr 5 t
4B Power Distributor 177,330 Cr 16 t
4C Power Distributor 70,930 Cr 10 t
5B Power Distributor 496,530 Cr 32 t
5C Power Distributor 198,610 Cr 20 t
5D Power Distributor 79,440 Cr 8 t
6B Power Distributor 1,390,280 Cr 64 t
6C Power Distributor 556,110 Cr 40 t
6D Power Distributor 222,440 Cr 16 t
6E Power Distributor 88,980 Cr 40 t
Power Plant Price Mass Efficiency Power
2B Power Plant 53,410 Cr 2 t C 8.8
2C Power Plant 17,800 Cr 1.3 t C 8
2D Power Plant 5,930 Cr 1 t D 7.2
2E Power Plant 1,980 Cr 2.5 t F 6.4
3B Power Plant 169,300 Cr 4 t C 11
3C Power Plant 56,440 Cr 2.5 t C 10
3D Power Plant 18,810 Cr 2 t D 9
3E Power Plant 6,270 Cr 5 t F 8
7D Power Plant 1,899,600 Cr 32 t D 22.5
8C Power Plant 18,065,170 Cr 80 t C 30
Thrusters Price Mass
2A Thrusters 160,220 Cr 2.5 t
2B Thrusters 53,410 Cr 4 t
2C Thrusters 17,800 Cr 2.5 t
2D Thrusters 5,930 Cr 1 t
2E Thrusters 1,980 Cr 2.5 t
3C Thrusters 56,440 Cr 5 t
3D Thrusters 18,810 Cr 2 t
3E Thrusters 6,270 Cr 5 t
7B Thrusters 17,096,370 Cr 128 t
Internal Compartment
Advanced Docking Computer Price Mass
1E Advanced Docking Computer 0 Cr 0 t
Auto Field-Maintenance Unit Price Mass
2B Auto Field-Maintenance Unit 486,000 Cr 0 t
3C Auto Field-Maintenance Unit 291,600 Cr 0 t
5D Auto Field-Maintenance Unit 314,930 Cr 0 t
6D Auto Field-Maintenance Unit 566,870 Cr 0 t
7E Auto Field-Maintenance Unit 340,120 Cr 0 t
8E Auto Field-Maintenance Unit 612,220 Cr 0 t
Bi-Weave Shield Generator Price Mass
3C Bi-Weave Shield Generator 84,650 Cr 5 t
Cargo Rack Price Mass Capacity
1E Cargo Rack 1,000 Cr 0 t 2 t
2E Cargo Rack 3,250 Cr 0 t 4 t
3E Cargo Rack 10,560 Cr 0 t 8 t
4E Cargo Rack 34,330 Cr 0 t 16 t
5E Cargo Rack 111,570 Cr 0 t 32 t
6E Cargo Rack 362,590 Cr 0 t 64 t
7E Cargo Rack 1,178,420 Cr 0 t 128 t
8E Cargo Rack 3,829,870 Cr 0 t 256 t
Decontamination Limpet Controller Price Mass
1E Decontamination Limpet Controller 0 Cr 0 t
3E Decontamination Limpet Controller 0 Cr 0 t
5E Decontamination Limpet Controller 0 Cr 0 t
7E Decontamination Limpet Controller 0 Cr 0 t
Detailed Surface Scanner Price Mass
1I Detailed Surface Scanner 250,000 Cr 1.3 t
Frame Shift Drive Interdictor Price Mass
1E Frame Shift Drive Interdictor 12,000 Cr 1.3 t
3A Frame Shift Drive Interdictor 7,620,480 Cr 5 t
3C Frame Shift Drive Interdictor 846,720 Cr 5 t
3D Frame Shift Drive Interdictor 282,240 Cr 2 t
4B Frame Shift Drive Interdictor 7,112,450 Cr 16 t
4D Frame Shift Drive Interdictor 790,270 Cr 4 t
4E Frame Shift Drive Interdictor 263,420 Cr 10 t
Fuel Scoop Price Mass Rate
1E Fuel Scoop 310 Cr 0 t 18 kg/s
Hatch Breaker Limpet Controller Price Mass Count Duration Range
1A Hatch Breaker Limpet Controller 9,600 Cr 1.3 t 1 18 s 3.5 km
1B Hatch Breaker Limpet Controller 4,800 Cr 2 t 2 24 s 3 km
1C Hatch Breaker Limpet Controller 2,400 Cr 1.3 t 1 30 s 2.5 km
1E Hatch Breaker Limpet Controller 600 Cr 1.3 t 2 42 s 1.5 km
3B Hatch Breaker Limpet Controller 43,200 Cr 8 t 4 21 s 3.24 km
3C Hatch Breaker Limpet Controller 21,600 Cr 5 t 3 26 s 2.7 km
5B Hatch Breaker Limpet Controller 388,800 Cr 32 t 9 18 s 3.96 km
7B Hatch Breaker Limpet Controller 3,499,200 Cr 128 t 18 14 s 5.16 km
7C Hatch Breaker Limpet Controller 1,749,600 Cr 80 t 15 18 s 4.3 km
7D Hatch Breaker Limpet Controller 874,800 Cr 32 t 12 22 s 3.44 km
Planetary Vehicle Hangar Price Mass Vehicle Count
2H Planetary Vehicle Hangar 18,000 Cr 12 t 1
4H Planetary Vehicle Hangar 72,000 Cr 20 t 2
6G Planetary Vehicle Hangar 691,200 Cr 17 t 4
6H Planetary Vehicle Hangar 576,000 Cr 34 t 4
Prospector Limpet Controller Price Mass Count Range
1A Prospector Limpet Controller 9,600 Cr 1.3 t 1 7 km
1B Prospector Limpet Controller 4,800 Cr 2 t 1 6 km
1C Prospector Limpet Controller 2,400 Cr 1.3 t 1 5 km
1D Prospector Limpet Controller 1,200 Cr 0.5 t 1 4 km
1E Prospector Limpet Controller 600 Cr 1.3 t 1 3 km
3B Prospector Limpet Controller 43,200 Cr 8 t 2 6.6 km
3C Prospector Limpet Controller 21,600 Cr 5 t 2 5.5 km
3D Prospector Limpet Controller 10,800 Cr 2 t 2 4.4 km
3E Prospector Limpet Controller 5,400 Cr 5 t 2 3.3 km
5D Prospector Limpet Controller 97,200 Cr 8 t 4 5.2 km
5E Prospector Limpet Controller 48,600 Cr 20 t 4 3.9 km
7D Prospector Limpet Controller 874,800 Cr 32 t 8 6.8 km
7E Prospector Limpet Controller 437,400 Cr 80 t 8 5.1 km
Refinery Price Mass Bins
1A Refinery 486,000 Cr 0 t 4
1B Refinery 162,000 Cr 0 t 3
1C Refinery 54,000 Cr 0 t 2
1E Refinery 6,000 Cr 0 t 1
2A Refinery 1,020,600 Cr 0 t 6
2B Refinery 340,200 Cr 0 t 5
2C Refinery 113,400 Cr 0 t 4
2D Refinery 37,800 Cr 0 t 3
2E Refinery 12,600 Cr 0 t 2
Rescue Multi Limpet Controller Price Mass
3C Rescue Multi Limpet Controller 0 Cr 0 t
Shield Cell Bank Price Mass Cells Recharge
1A Shield Cell Bank 20,195 Cr 1.3 t 3 D
1B Shield Cell Bank 8,078 Cr 2 t 4 D
1C Shield Cell Bank 3,231 Cr 1.3 t 3 D
2A Shield Cell Bank 56,547 Cr 2.5 t 4 C
2B Shield Cell Bank 22,619 Cr 4 t 5 D
2C Shield Cell Bank 9,048 Cr 2.5 t 4 D
3C Shield Cell Bank 25,333 Cr 5 t 4 D
3D Shield Cell Bank 10,133 Cr 2 t 3 D
7B Shield Cell Bank 3,892,770 Cr 128 t 6 B
7D Shield Cell Bank 622,843 Cr 32 t 4 C
7E Shield Cell Bank 249,137 Cr 80 t 6 D
8D Shield Cell Bank 1,743,961 Cr 64 t 4 C
8E Shield Cell Bank 697,584 Cr 160 t 6 C
Shield Generator Price Mass
2B Shield Generator 53,410 Cr 4 t
2E Shield Generator 1,980 Cr 2.5 t
3B Shield Generator 169,300 Cr 8 t
Standard Docking Computer Price Mass
1E Standard Docking Computer 4,500 Cr 0 t
Advertisement